Hot Mix Asphalt Plant – Getting The Right Material To The Project

Building a road is a complicated process. From conception to opening for traffic, a road construction project can take several years. Improvements in equipment has helped streamline the process and reduce the overall project time, such as the hot mixingplant, small and more efficient earth-moving equipment  Yet, there are still certain steps which simply must be followed to ensure a road construction project is done well and it will last. These projects cost millions of taxpayer dollars, so it is critical that users will get the machine from good asphalt batch mix plant manufacturers, and each step of the process is done correctly.

Planning

Most transportation planning is ongoing. A particular road project will generally begin with an evaluation of the local transportation system. This analysis will include traffic volume, bridge, road conditions and crash statistics. Transportation planners then work with other experts, including engineers and environmentalists to identify trends and determine where to locate the next project. There are other considerations as well, including environmental issues, obtaining enough property to build the road, funding the project, impact on utilities, and designing the project so that it enhances community transportation. If you need to buy an asphalt plant, you can check more here: http://asphaltmixingplants.net/.

hot mix asphalt plant

Design

Obtaining property to build a road can be done in a couple of ways, but the two most common are to purchase it from the owner or to declare eminent domain and seize the property. Either way, the owner receives some type of reimbursement. Once the project is approved and the property obtained, a site survey should be performed. New innovations such as laser surveys and global positioning systems are helping make this process easier. There are many factors which can influence the design of a road, including terrain, location, traffic volume, drainage, future development, and the ratio of big trucks to autos. Once the design is finished and approved, the bid will be announced.

Since most road projects are done by the government, it is usually the low bidder who wins the contract. At times, the project may be awarded to several contractors who will perform various parts of the project.

Earthwork

Once the contract is awarded, the road project can start. It begins with moving earth to provide the foundation for the road. The earth-moving is considered to be one of the most important parts of a road project. If a road’s foundation is not done correctly, the road will fail, costing much more money later on. To build the foundation, the contractor will use heavy earth-moving equipment to build embankments, grade the foundation and install sewers and drains. Everything of your asphalt production lant must pass inspection before moving on to the paving.

Paving

Once the foundation of the road is prepared, the contractor will begin paving. Contractors will generally use either asphalt or concrete to pave a roadway. Asphalt is prepared at the hot mix asphalt plant and transported to the project site where it is laid and then compacted. Asphalt is typically used on rural or suburban roadways while concrete is used most often to build major highways and bridges. With the help of asphalt plants, users can get high quality asphalt mixtures easily, and you can check here: http://asphaltmixingplants.net/asphalt-hot-mix-plant/.

Once the road is paved and cured, it can open to traffic. Building a new road is a long, intensive process, but it is important to get every step right to ensure the road lasts as long as possible.